Closing, Escrow & TitlePart of: Real Estate Contracts, Escrow & Closing Explained
New-Home Surveys: Setbacks, Encroachments, Fence Lines
A newly built home's fence, patio, or AC pad is placed by a construction crew working off a site plan, not necessarily checked against the recorded plat by a surveyor. A current survey is usually what catches that before it becomes a title problem.

A newly built home's fence, patio, or AC pad is placed by a construction crew working off a site plan, and it is not necessarily checked against the recorded plat by a licensed surveyor, so it can end up over a lot line or inside an easement. A standard exception on the owner's title policy excludes that exact problem by default. A current survey is what typically gets it found and the exception amended.
The Survey Documents You Already Have
A new-construction closing package is full of documents that look like they answer the boundary question, including how a title search and title insurance work together. Most of them do not.
The current national standard for a full land title survey is the ALTA/NSPS Minimum Standard Detail Requirements for Land Title Surveys, jointly published by the American Land Title Association (ALTA) and the National Society of Professional Surveyors (NSPS). The 2026 edition took effect February 23, 2026, replacing the 2021 edition (ALTA/NSPS, 2026 Standards).
Plot Plans Aren't Boundary Surveys
A builder's plot plan shows where the house sits on the lot for permitting purposes. A lender's location certificate confirms roughly where structures sit for the lender's own risk. Neither is produced to the ALTA/NSPS standard, and neither substitutes for a survey sealed by a licensed surveyor for title purposes.
A CO Doesn't Confirm Your Lot Lines
A certificate of occupancy tells you the building department signed off on the structure as built. It says nothing about whether that structure, or the fence and pad around it, sits inside your recorded boundary lines.
The Standard Survey Exception, Explained
A survey and boundary exception is a standard feature of an owner's title policy. The exact wording, and the procedure to amend it, are set by each state's insurance regulator or by each underwriter's own filed forms, so the language on your policy is a question for your own title company. This exception sits on the owner's policy specifically; see the difference between an owner's policy and a lender's policy.
Texas is a useful example because its insurance regulator writes and publishes the exact policy wording and the procedural rules that govern it, which makes the language quotable. What follows is Texas's specific language, used to show what a survey/boundary exception looks like, not a claim that every state uses this wording.
What Encroachment Means in a Policy
In Texas's state-promulgated Owner's Policy, Form T-1, Covered Risk 2(c) defines "encroachment" to include both encroachments of existing improvements on the insured land onto adjoining land, and encroachments onto the insured land of improvements located on adjoining land (Texas Department of Insurance, Form T-1). The policy says in the same paragraph that this coverage is deleted by Schedule B, Exception 2, unless a survey of the land acceptable to the company is timely provided and the applicable premium is paid to amend the exception to "shortages in area." Even after that amendment, in other words, shortages in area stay excepted.
The standard exception itself, verbatim from Form T-1 Schedule B, Exception 2, reads:
"Any discrepancies, conflicts, or shortages in area or boundary lines, or any encroachments or protrusions, or any overlapping of improvements."
Why Texas Is the Example Here
That sentence excludes coverage for exactly what a new-construction buyer should worry about: a fence, pad, or eave sitting past the boundary. Ask your own title company, in writing, whether your state's policy carries an equivalent exception and what amends it. Policy forms and procedures are set state by state, so get the answer for your own contract rather than assuming Texas's applies.
How a Survey Amends That Exception
A survey/boundary exception is not permanent. It can be amended, and the mechanics differ by state and underwriter.
Texas's T-47 Affidavit Route
Under Texas Procedural Rule P-2, a title company may amend the area-and-boundary exception using an existing survey plus an affidavit verifying it, which for residential real property is the Form T-47 affidavit, instead of requiring a brand-new survey. The rule lets the company do that regardless of the age of the survey or the identity of the person it was prepared for (Texas Department of Insurance, Rule P-2).
A separate sub-rule covers residential refinances. On a loan renewing, extending, or satisfying a lien already covered by a mortgagee policy, a borrower may substitute an affidavit for an updated survey if the prior survey is dated no earlier than seven years before the new policy and the borrower attests that, since that survey, there have been:
- No construction projects on the property.
- No changes to boundary fences or walls.
- No nearby construction on adjoining property.
- No conveyances, replattings, or easement grants.
On an owner's policy, amending the exception carries the premium prescribed by Rate Rule R-16, and a title company may not require an indemnity from a seller, buyer, borrower, or lender in order to provide area and boundary coverage. That matters for new construction, where the affidavit route has less to work with: the only existing survey may predate the house itself, and the lot has just been through the construction and fence-setting that the affidavit is written to rule out. If buying directly from a builder, also review the other purchase-agreement clauses worth checking before you sign; the survey requirement is often set by that contract.
Ask Your Title Company in Writing
- Does my state's policy have an equivalent exception? Ask for the exact Schedule B language.
- What amends it here? A new survey, an existing survey plus affidavit, or something else your underwriter accepts.
- What does it cost to amend? Ask for the specific premium tied to that endorsement.
- Is a location certificate acceptable, or must it be a full boundary survey?
Why New Construction Raises the Risk
A recorded plat shows where a subdivision's boundary monuments were originally set. The monuments themselves, pins or markers driven into the ground, are what a later survey finds and measures from. Construction is exactly the activity that can destroy them. See what a new subdivision's recorded plat shows and what it blocks you from building for how that same plat controls what you can build later.
Grading Can Bury Boundary Monuments
California law offers a concrete illustration. Under California Business and Professions Code Section 8771, when construction or right-of-way work could destroy, damage, cover, disturb, or otherwise obliterate a monument controlling a subdivision, tract, boundary, road, or street, a permanent monument must be reset in the surface of the new construction or a witness monument set to perpetuate the location, and a corner record or record of survey filed with the county surveyor before a certificate of completion is recorded for the project (California Legislative Information, BPC §8771).
The statute puts responsibility on the governmental agency performing or permitting the work, which has to make sure that it or the landowner doing the work provides for that monument perpetuation. It is not a duty this article claims runs directly to every private homebuilder. Use it for what it plainly shows: grading and heavy equipment on a freshly platted lot are exactly what puts boundary monuments at risk.
What the 2026 Standard Added
The 2026 ALTA/NSPS Standards added a new, optional Table A Item 20: a table on the face of the survey plat summarizing designated conditions and potential encroachments (ALTA/NSPS, FAQ on the 2026 Standards). Section 5.C.i separately requires a surveyor to show evidence of a possession or occupation line, such as a fence that does not match the deed line, "regardless of proximity to perimeter boundary lines." If you order a full ALTA/NSPS survey, ask whether Table A Item 20 was selected.
Tying Corners Back to County Records
A survey is only as good as the record it ties back to, and states run their own systems for filing what a surveyor found. California's is a concrete, published example.
California's Record-of-Survey Filing
In California, a licensed land surveyor or civil engineer who makes a field survey may file a record of that survey with the county surveyor. Filing a record relating to land boundaries or property lines becomes mandatory when the field survey turns up things like:
- Material evidence or physical change that does not appear on an existing map.
- A material discrepancy with a recorded map.
- Points and lines set on a deeded parcel that no existing map shows.
When it is required, the filing is due within 90 days after the boundary monuments are set during the field survey, or within 90 days after the field survey is completed, whichever occurs first. The county surveyor examines it before it goes to the county recorder (California Legislative Information, BPC §8762).
That mechanism lets a future surveyor, or a future buyer's title company, find your lot's original monuments even after the ground has been disturbed. Ask your surveyor which county office holds the record for your lot.
Encroachment vs. Adverse Possession
An encroachment found today and an adverse-possession claim are two different things separated by time and state law.
The Elements Most States Recognize
Adverse possession is generally described as requiring possession that is actual, open and notorious, exclusive, hostile, and continuous for a statutory period. That period "varies by jurisdiction" rather than being set nationally, and can run from roughly five years to ten or more depending on the state (Cornell Law School, Legal Information Institute).
California vs. Florida's Clocks
California and Florida differ enough to show this is genuinely a state-by-state question, not a variation on one shared rule.
| State | Period | Possession requirement | Tax requirement | Extra filing |
|---|---|---|---|---|
| California | 5 years, continuous | Substantial enclosure, or land usually cultivated or improved | All state, county, or municipal taxes paid for the full 5 years | No filing required by the statute |
| Florida | 7 years, continuous | Substantial enclosure, or usual cultivation, maintenance, or improvement | Outstanding taxes paid within 1 year of entering possession, and every remaining year | Notarized "return" filed with the county property appraiser within 30 days after that first tax payment |
California requires occupation and claim for five continuous years, shown through a substantial enclosure or land usually cultivated or improved, together with all state, county, or municipal taxes paid for that same five years, per the county tax collector's certified records (California Legislative Information, CCP §325).
Florida requires seven years of actual, continued possession under a claim of title, shown by substantial enclosure or by cultivation, maintenance, or improvement in a usual manner, plus all outstanding taxes and matured special-improvement-lien installments paid within one year of entering possession and then paid for every remaining year. Florida also requires a "return" filed with the county property appraiser within 30 days after that first payment, on a Department of Revenue form carrying a notarized attestation and a bold notice that the return "DOES NOT CREATE ANY INTEREST ENFORCEABLE BY LAW IN THE DESCRIBED PROPERTY" (The Florida Senate, Fla. Stat. §95.18).
Neither state's rule is the national rule. Check your own state's statute before assuming either timeline applies to you.
Why This Isn't a DIY Legal Question
Whether a fence, pad, or driveway on your lot could ripen into a claim depends on facts a survey and title company are equipped to evaluate, and on your state's statute. Bring contested facts to your title company or a real estate attorney.
Surveyors Are Licensed by Your State, Too
A boundary survey is not a generic service. The surveyor is licensed and regulated by your state, which sets the minimum content the survey has to include.
Florida's Boundary-Survey Rule
Florida keeps a named administrative rule for this, Florida Administrative Code Rule 5J-17.052, "Standards of Practice – Boundary Survey Requirements," effective July 15, 2018, adopted under the state's Professional Surveyors and Mappers chapter and setting minimum standards specifically for boundary surveys (Florida Administrative Code, Rule 5J-17.052). California licenses land surveyors under its own separate chapter of the Business and Professions Code, with its own filing rules. The two states do not say the same thing, which is the point: ask which state board licenses your surveyor and which standard that board applies to a boundary survey.
Deciding Whether You Need One
A survey is not free, and not every new-construction closing needs a full ALTA/NSPS survey. A few questions narrow the decision, starting with which lot traits actually affect resale value.
Questions to Put in Writing
- What does my state's policy exclude by default? Ask for the actual Schedule B language, not a summary.
- What survey or affidavit removes that exclusion here?
- Did the builder's grading or trenching happen near the platted boundary lines?
- Is there an existing survey for this lot, and how recent relative to when construction finished?
- Are there fences, walls, or shared driveways near the property line that predate my purchase?
Weighing Cost Against Protection
A survey answers, before you close, whether the fence, patio, or AC pad a construction crew installed sits inside your recorded lot lines, protecting you from discovering that years later, after an exception has gone unaddressed. Survey pricing is local and depends on lot size, terrain, and the scope you order, so get a written quote from a licensed surveyor in your county and ask your title company which scope it will accept before you pay for one.
The Bottom Line
A newly platted lot is not automatically a settled boundary. Construction can bury the monuments it was staked from, and the fence or pad a builder installs is not necessarily checked against the recorded plat as a matter of course. Ask your title company, in writing, what your state's policy excludes and what amends that exclusion, and treat a current survey as the tool that answers the question before it becomes a title problem instead of after. For the rest of the process, see the full closing, escrow, and title walkthrough or the new-construction buyer's guide.
Frequently asked questions
- What does the "survey exception" on my title insurance policy actually mean?
- It means boundary and encroachment problems are excluded from coverage by default. Texas's public Schedule B Exception 2, as one concrete example, excludes discrepancies, conflicts, or shortages in area or boundary lines, encroachments or protrusions, and overlapping improvements. Wording and procedure are set state by state, so ask your title company for your own policy's exact language.
- How do I actually get that exception removed on a new-construction home?
- In Texas, a title company can amend the exception using a new survey, or an existing survey plus an affidavit verifying it (a Form T-47 for residential property), for the premium set by Rate Rule R-16 on an owner's policy. On a qualifying residential refinance, a prior survey dated no earlier than seven years before the new policy plus a borrower affidavit of no changes can substitute for an updated survey. Note that the amendment narrows the exception to "shortages in area" rather than deleting it outright. The exact procedure and required forms vary by state and underwriter, so ask your own title company in writing what it requires.
- Why would a brand-new home have a boundary problem if the county already approved the plat?
- The recorded plat shows where boundary monuments were originally set, but grading, trenching, and heavy equipment during a build are exactly the activity that can bury or destroy that physical monument. California, for example, requires a monument that could be destroyed, damaged, covered, disturbed, or obliterated by construction to be reset or witnessed and a corner record or record of survey filed with the county surveyor before a certificate of completion is recorded; that statute assigns responsibility to the governmental agency performing or permitting the work, so treat it as an illustration of the mechanism rather than a rule that binds every builder nationwide.
- Is adverse possession really a risk on a home that's only been built for a year or two?
- Not imminently. Adverse possession requires continuous possession for a statutory period that varies by jurisdiction, and the examples in this article run from five years in California to seven in Florida, so a fence or pad in place for only a year or two is very unlikely to have ripened into a claim. The near-term risk is simply not knowing an encroachment exists; finding it early is what keeps it cheap and simple to fix.
- Does every state require the same number of years or the same steps for adverse possession?
- No. California requires five years of continuous occupation shown by substantial enclosure or usual cultivation or improvement, plus all state, county, or municipal taxes paid for those five years. Florida requires seven years of possession plus outstanding taxes paid within a year of entering possession and every remaining year, plus a notarized return filed with the county property appraiser within 30 days after that first payment. Check your own state's statute rather than assuming either example applies.
- Who actually licenses the surveyor, and does that vary by state?
- Land surveying is licensed and regulated at the state level, and each state sets its own standards for what a boundary survey must show. Florida's Rule 5J-17.052, effective July 15, 2018, is one state's named example covering boundary-survey requirements specifically, while California regulates land surveyors under a separate chapter of its Business and Professions Code. Ask which license and which state standard applies to the surveyor you hire.
Sources
- 2026 Minimum Standard Detail Requirements for ALTA/NSPS Land Title Surveys (policy forms page), American Land Title Association (ALTA) and National Society of Professional Surveyors (NSPS) Industry research
- Frequently Asked Questions and Other Guidance on ALTA/NSPS Land Title Surveys Including the 2026 Standards, American Land Title Association (ALTA) and National Society of Professional Surveyors (NSPS) Industry research
- Form T-1, Owner's Policy of Title Insurance, Texas Department of Insurance Official source
- Procedural Rule P-2, Amendment of Exception to Area and Boundaries, Texas Department of Insurance Official source
- California Business and Professions Code Section 8771 (monument perpetuation), California Legislative Information, California State Legislature Official source
- California Business and Professions Code Section 8762 (Record of Survey / Corner Record filing), California Legislative Information, California State Legislature Official source
- California Code of Civil Procedure Section 325 (adverse possession), California Legislative Information, California State Legislature Official source
- Florida Statutes Section 95.18 (real property actions; adverse possession without color of title), The Florida Senate (Florida Statutes) Official source
- Florida Administrative Code Rule 5J-17.052, Standards of Practice – Boundary Survey Requirements, Florida Administrative Code (Professional Surveyors and Mappers, Department of Agriculture and Consumer Services) Official source
- Adverse Possession (Wex Legal Dictionary), Cornell Law School, Legal Information Institute Reporting






