Easements on a New Plat: Drainage, Utility, and the Fence You Cannot Build
Your recorded plat marks utility, drainage, access, and no-build lines across your lot. Here is what each one actually lets someone else do, what it stops you from building, and how to verify it yourself at the county recorder.

Every easement marked on your recorded plat is a legal right that lets someone else, typically a utility company, a drainage authority, or a neighboring lot, use a defined strip of your property for a stated purpose. In exchange, that strip is generally off limits to anything that would interfere with the easement's purpose: a fence across a drainage swale, a shed over a sewer line, a pool built inside a utility easement.
The plat itself is what creates these rights. Once it is recorded with your county, the easements dedicated on its face attach to the lot rather than to the developer who drew them. As the City of Killeen, Texas, puts it in its homeowner guidance, easements "provide ongoing access to parts of a property for utility companies, even if the property changes ownership."
For a general primer on the concept, see what an easement is in real estate; this article goes further into what a new subdivision plat specifically shows and what it blocks you from building.
What an easement lets someone do
An easement is not a loan of your yard. It is a specific, purpose-limited right that a developer dedicates or grants on the plat when a subdivision is created. Recording is what makes it stick.
Under Nevada's platting law, for example, title to property dedicated or accepted for streets and easements passes when the final map is recorded, and the owner's certificate on that map is what offers land for dedication and grants any permanent utility easement, with the utility's own written approval attached (NRS 278.390 and NRS 278.374).
Your state's platting statute will have its own version of that rule under a different section number, so read Nevada here as an illustration rather than as your own law.
You still own the land underneath. You just cannot use it in a way that blocks the stated purpose.
Types of easements on a plat
A single plat can carry several different easement types, each doing a different job:
- Public utility easement: lets a gas, electric, water, or telecom provider install and maintain lines across your lot. In Nevada, a subdivision final map has to show an easement for the public utilities providing gas, electric and telecommunications service and a second one for water and sewer service, unless the governing body relieves the developer of that dedication (NRS 278.372 and NRS 278.329).
- Drainage easement: carries stormwater across or through your property toward a public system or a detention area, so anything that changes the grade inside it changes where the water goes.
- Access or ingress-egress easement: gives another lot, or the public, the right to cross part of your property to reach a road, a shared driveway, or a landlocked parcel. A Nevada final map has to show the roads and access easements the owner intends to offer for dedication (NRS 278.372).
- Sanitary sewer easement: reserves a corridor for the sewer main serving your block. Nevada treats it as a separate item from the gas, electric and telecommunications easement (NRS 278.372).
- No-build or building setback line: marks where you may not place a structure. It limits your own construction rather than granting anyone a right to use your land (more on that distinction below).
- Landscape or screening easement: reserves a strip, often along a busier road or between different land uses, for required buffer plantings or a screening wall.
- Conservation or detention area: sets aside open space, a floodplain, or a stormwater detention basin and keeps it from being built on or further subdivided.
On a lot outside city water and sewer, the plat's utility and drainage lines interact directly with where a septic drainfield and a well can legally sit; see the order of operations for well and septic permitting on a new build for how those siting rules stack on top of what's already marked here. The same drainage lines usually trace back to how the lot's soil handles water in the first place; see how to pull a lot's free shrink-swell and drainage data before you build for the tool that surfaces it.
What an easement stops you from building
Inside the easement, the holder's right generally comes first. The City of Killeen, Texas, which publishes utility-easement guidance for its residents, says an easement typically carries the right of ingress and egress plus the right to "keep the easement free from structures or plantings that will interfere with the operation of the utility system located in the easement" (City of Killeen).
Killeen also tells owners that in most cases they cannot block an easement, because it is a legal right granted to another party.
Access runs with that right. In Killeen, typical utility easements let properly registered utility owners and their contractors enter a property to reach the easement and install and maintain infrastructure. Killeen's guidance is direct on the other side of it: the property owner "cannot hinder the easement's designated use," even though the underlying land still belongs to them.
What happens to a shed or fence already sitting inside the strip, and who pays to move it, is not a single national rule. It is set by your local ordinance and by the language of the recorded easement itself, so read both before you build rather than after you get a letter.
Killeen does address damage separately. If construction activity in the easement area damages your property, its guidance tells owners to document the damage and seek compensation from the party responsible for it.
Improvements most likely to interfere with an easement's stated use:
- A fence or wall built across the easement, especially one without a gate or removable section, since the easement usually reserves a right of entry and exit.
- A shed, patio cover, or other structure with a permanent foundation placed inside the strip.
- A pool, retaining wall, or regrading that changes how stormwater moves through a drainage easement.
No width here is standard. Nevada's platting chapter never states an easement width at all: for a division of land into large parcels it lets the planning commission or governing body designate the location and width of easements for roads and public utilities (NRS 278.4715), and for a subdivision it requires the final map to show the easements and to satisfy whatever additional requirements the local ordinance prescribes (NRS 278.372).
As one real example, not a typical figure: the plat diagrams in the City of Killeen's guidance label utility easements 10 feet wide and drainage easements 15 feet and 34 feet wide. Those are Killeen's numbers on Killeen's example plats. Your own plat and local ordinance set yours.
Setbacks vs. easements
Buyers often read a setback line and an easement line as the same thing. They are not.
A setback is a zoning rule. Nevada's zoning statute is a fair illustration of where that power comes from: within a zoning district, the local governing body may regulate and restrict the erection, construction, alteration or use of buildings, structures or land, and those regulations have to be adopted in accordance with the master plan for land use (NRS 278.250).
A setback line is one of those local restrictions. It limits where you can build. It does not give anyone else a right to use your land.
An easement is a property right held by someone else. It is created by dedication or grant on the plat, not by a zoning ordinance, and it lets a specific party, a utility, an agency, or a neighbor, use part of your lot for a stated purpose (NRS 278.374 and NRS 278.390).
| Setback | Easement | |
|---|---|---|
| What it is | A zoning limit on where you may build | A property right held by a third party |
| Who benefits | No one directly; it is a land-use rule | The named easement holder (utility, agency, neighbor) |
| Created by | Local zoning regulations adopted under the master plan | Dedication or grant on the recorded plat |
| What it stops | You from placing a structure in that zone | You from interfering with the holder's stated use |
For how these lines interact with lot premiums and resale value, see which lot traits actually affect resale value.
Drainage and common-area easements on the plat are usually the same infrastructure an HOA takes over maintenance of once the developer hands off control, so it's worth reading what happens to those obligations at HOA turnover alongside your plat. A special taxing district recorded against the same plat is a separate encumbrance again; see how CDD, MUD, and SID assessments show up on new-home lots if your subdivision has one.
How to verify your plat
Do not rely on a real estate listing or a builder's marketing site plan for easement locations. Pull the actual recorded plat. If you are working through the new-construction buyer's guide, this step fits right after you get a lot assignment from the builder.
Plats are public records, and the office that holds them goes by different names: county recorder in some states, county clerk or clerk of the circuit court in others. In Tarrant County, Texas, for example, the county clerk makes plats available to view and purchase online, and charges $3.50 per page plus $5 for certification if you want a certified copy.
What you need to pull it
Tarrant County asks a plat request to include:
- The lot number and the block number.
- The name of the addition, which is what Texas calls the subdivision.
- The name of the city.
- The approximate recording date.
- The name of the owner, if you have it.
Check your own county's page, because the required fields, the fees, and the online search all vary. Utility easements may also show up in your deed and in a survey done at purchase. Killeen's guidance directs residents to check both, plus the county's real property records, before assuming a strip of yard is unencumbered.
What a survey shows that a plat may not
A recorded plat shows what was dedicated when the subdivision was created. It will not show an easement added later by a separate recorded document, and it will not show where your specific improvements sit relative to those lines today.
That is the job of a survey, and "survey" is not one product. The builder's plot plan in your closing folder, a mortgage inspection, a boundary survey, and a land title survey are different documents with different scopes.
The named standard for that last category is the Minimum Standard Detail Requirements for ALTA/NSPS Land Title Surveys, published jointly by the American Land Title Association and the National Society of Professional Surveyors. ALTA lists a 2026 edition, effective February 23, 2026, alongside the earlier 2021 edition. The full text is distributed only to ALTA members, licensees, and subscribers, so treat any summary of what it requires, including this one, as a pointer rather than the standard itself.
If you want a document that confirms where a fence, driveway, or addition sits relative to the recorded easements on your lot, ask the surveyor in writing which product you are buying and whether it depicts those easements.
For the specific new-construction version of this problem, a fence, patio, or AC pad placed by a construction crew that was not necessarily checked against these recorded lines, see why a newly built home can still have an undiscovered boundary problem.
Vacating or relocating an easement
An easement on your plat is not necessarily permanent. It can sometimes be vacated (legally removed) or relocated, but not by you alone.
Nevada spells out one version of the process in unusual detail, so it is worth reading as an example rather than as your own state's law. Vacating a street or an easement owned by a Nevada city or county starts with a written petition filed with the planning commission or the governing body by an abutting owner or a local government (NRS 278.480).
For a right-of-way or easement held for a public purpose, the local government has to notify the abutting owners and publish notice before a public hearing, and it may only order the vacation if it is satisfied the public will not be materially injured.
Utilities get their own step, and Nevada attaches it to street vacations specifically: before vacating a street, the local government must give each public utility and video service provider serving the area written notice, and any of them that asks for one is entitled to have an easement reserved and recorded in its favor first.
Drainage easements get extra protection. Nevada lets a local government adopt a simplified, no-hearing procedure for vacating easements it owns, but that shortcut cannot be used for a street, a drainage easement, a sidewalk, or another pedestrian right of way. Those go the long way, through notice and a hearing.
Vacation and relocation rules vary by state, and the details above are Nevada's. The shape of it is what travels: a formal process through your local government, notice to the parties who rely on the easement, and no realistic path without the holder's cooperation.
A builder's own purchase agreement may reference the recorded plat as an attached exhibit rather than restating what it shows, so read the two documents together; the other purchase-agreement clauses worth checking closely before you sign covers the rest of that paperwork.
The bottom line
Read your plat as a map of who else has rights to your lot, not just where your lot lines sit. Utility, drainage, access, and sewer easements let a specific party use a specific strip for a specific purpose. Setback lines limit where you can build. None of it is guesswork if you pull the recorded plat yourself and confirm it against a proper survey before you build anything near a line.
Frequently asked questions
- What's the difference between an easement and a setback?
- A setback is a zoning rule that limits where you may build on your own lot, set by your local governing body. An easement is a property right held by someone else, created by dedication on the plat, that lets a specific party use part of your lot for a stated purpose. A plat commonly shows both, and each is enforced differently.
- Can I build a fence or shed inside a utility easement?
- Not without the easement holder's consent. The City of Killeen, Texas, tells homeowners that a utility easement carries the right to keep the strip free from structures or plantings that interfere with the utility system, and that in most cases an owner cannot block an easement because it is a legal right granted to another party. Whether you would have to move something already built there, and who pays for it, is governed by your local ordinance and by the recorded easement itself, so get written consent from the specific utility or agency before building anything inside the marked strip.
- How do I find the easements on my property?
- Pull your recorded plat from the county office that records plats, called the county recorder in some states and the county clerk or clerk of the circuit court in others. Tarrant County, Texas, for example, asks for the lot number, block number, name of the addition, city, approximate recording date, and the owner's name if you have it, and charges $3.50 per page plus $5 for certification. Check your own county's process, since fees and online access vary.
- Can an easement be removed from my property?
- Sometimes, through a formal vacation process run by your local government. Nevada is a detailed example: an abutting owner or local government files a written petition with the planning commission or governing body, and before a street is vacated the local government must notify each public utility serving the area and reserve an easement for any utility that asks for one. Nevada also bars its simplified no-hearing procedure for drainage easements. The details vary by state, but it is not something an owner can do alone.
- Does a regular survey show every easement on my lot?
- Not necessarily, because a survey is not one standard product. A builder's plot plan or a mortgage inspection is not the same thing as a boundary survey, and neither is a land title survey. ALTA and NSPS jointly publish the Minimum Standard Detail Requirements for ALTA/NSPS Land Title Surveys, the named standard for that last category. Ask your surveyor in writing which product you are getting and whether it depicts the recorded easements on your lot.
Sources
- NRS 278.390 - Title to dedicated property passes when final map recorded, Nevada Legislature (Nevada Revised Statutes, Chapter 278) Official source
- NRS 278.372 and NRS 278.4715 - Contents of a subdivision final map, and local designation of easement location and width, Nevada Legislature (Nevada Revised Statutes, Chapter 278) Official source
- NRS 278.250 - Zoning districts and regulations, Nevada Legislature (Nevada Revised Statutes, Chapter 278) Official source
- NRS 278.480 - Vacation or abandonment of street or easement, Nevada Legislature (Nevada Revised Statutes, Chapter 278) Official source
- General Utility Easement Information (Development Engineering), City of Killeen, Texas Official source
- Copies of Plats, Tarrant County, Texas, County Clerk (Real Estate Records) Official source
- ALTA/NSPS Land Survey Standards (Policy Forms Collection), American Land Title Association and National Society of Professional Surveyors Industry research