Buying a HomePart of: The New-Construction Home Buyer's Guide
11-Month Warranty Walk: Act Before Year One Coverage Narrows
Coverage on a new-construction home is usually broadest in year one. Here is what actually controls your deadline, and how to build a written list before the window closes.

New-home warranties are commonly structured to cover the most ground in the first year and less after that. If you have not sent your builder anything in writing yet, the clock on that broadest coverage is already running, and for some buyers it has a documented, dated deadline.
What the 11-Month Warranty Walk Actually Is
The short answer
An 11-month warranty walk is a homeowner-led review of a new home, done roughly a month before its first anniversary, to compile a written list of defects while there is still time to submit it before year-one coverage narrows.
This is a descriptive framing, not an industry-defined term: no cited source here uses this exact phrase. The underlying timing pressure it describes, however, is real and traces to specific documents.
Hard deadline vs. soft deadline
Private new-home warranties are commonly structured in tiers. 2-10 Home Buyers Warranty, a third-party warranty administrator, describes a structural warranty on its own builder FAQ as one year of coverage for workmanship, two years of coverage for distribution systems, and a full ten years of insurance-backed coverage for qualifying structural defects.
That is a common structure, not a guaranteed one. Whether your home actually has a hard, calendar deadline depends on how it was financed:
- FHA or VA financing: you likely have a federally documented one-year written-notice deadline tied to a specific form in your closing file.
- Conventional financing: you have no federal equivalent. Your deadline, if any, is set entirely by your builder's or third-party administrator's plan document, or by your state's warranty statute where one exists.
Why Act at Month 11 Instead of Waiting for the Anniversary
When the one-year clock actually starts
For FHA- and VA-insured homes, the trigger date is not your purchase-contract date. Form HUD-92544, "Warranty of Completion of Construction," sets the one-year written-notice window from the date of original title conveyance or the date of initial occupancy, whichever occurs first.
Those two dates can land weeks apart from your closing paperwork's cover date, and the form has its own sub-provisions for items completed after conveyance. Waiting until you think a full year has passed risks missing the actual trigger date by days.
Check your closing paperwork first
Form HUD-92544 carries a printed instruction that completed copies go to both the homebuyer and the builder at closing, and that a copy be included in the case binder sent to HUD. If your home was FHA- or VA-financed, this document, and the exact date your window opened, may already be sitting in your closing file.
Building in a month of buffer before the anniversary gives you time to walk the home, compile a list, and get written notice delivered, rather than discovering a mailing delay after the window has already closed.
Three Deadlines You Might Actually Be Under
Depending on how your home was financed and where it sits, you could be under one, two, or all three of these systems at once.
1. FHA/VA warranty (Form HUD-92544)
Under HUD Handbook 4000.1's New Construction section, a lender seeking maximum financing on an FHA-insured new-construction loan must put both the builder's Form HUD-92541 certification and the Form HUD-92544 warranty of completion in the case binder. That is worth knowing, because it is also the reason the form should exist in your file at all. Homes financed at 90 percent loan-to-value or less sit under a shorter documentation list that does not name Form HUD-92544, so a low-loan-to-value FHA buyer may not have one.
The same section sets the inspection path. Proposed construction needs either copies of the building permit and certificate of occupancy, or three inspections (footing, framing, and final) by an ICC-certified inspector or the local building authority. A home already under construction needs the permit and certificate of occupancy, or a final inspection from one of those same parties.
2. Your builder's private warranty
Builders often sell or include a warranty administered by a third-party company, and the 1-2-10 split described above by 2-10 Home Buyers Warranty is one published version of that structure: one year of workmanship coverage, two years of distribution-systems coverage, ten years of structural coverage.
A marketed structure is not a guarantee of your specific terms, though. Residential Warranty Company, another third-party administrator, tells homeowners on its own site to refer to the warranty book they received at closing for exact coverage and warranty terms, and notes that coverage varies with the program the builder chose and the state the home is in.
3. State warranty law (California)
Some states layer their own statutory protections on top of, or instead of, a private warranty. California's Right to Repair Act (Civil Code Section 896) sets component-specific defect standards, and for many of those components the statute states its own deadline for bringing an action, independent of whatever a builder's private plan says. Measured from close of escrow unless noted:
- Plumbing and sewer systems, exterior pathways and driveways, and untreated steel fences: 4 years.
- Electrical systems: 4 years.
- Untreated wood posts, landscaping systems, and dryer ducts: 2 years.
- Irrigation systems and drainage: 1 year.
- Interunit noise transmission: 1 year from the original occupancy of the adjacent unit.
- Paint and stains: 5 years.
Manufactured products such as windows, doors, HVAC units, and appliances get a different treatment. The statute requires them to be installed so as not to interfere with the product's useful life, and where the manufacturer made no useful-life representation, or made one shorter than a year, the period is no less than one year.
California Civil Code Section 941 sets the outer boundary on top of those component periods: no action may be brought under the Right to Repair Act more than 10 years after substantial completion of the improvement.
This is one state's example, not a national rule. State statutes vary, and the site's 1-2-10 warranty explainer works through several additional states in depth.
The table below lines up all three systems side by side.
| Deadline system | What starts the clock | Your deadline |
|---|---|---|
| FHA/VA federal warranty (Form HUD-92544) | Title conveyance or initial occupancy, whichever is first | Written notice within 1 year |
| Private builder warranty (1-2-10 as published by one administrator) | Set by your specific plan booklet from closing | 1 year workmanship, 2 years distribution systems, 10 years structural in that published version; your booklet controls |
| California Right to Repair Act (state example) | Close of escrow, or substantial completion for the outer limit | Component deadlines of 1 to 5 years; written prelitigation notice required before suit; 10-year outer filing limit |
How to Run the Walkthrough
Walk it system by system
A general home inspection follows a defined, systematic scope, not a random glance around the property. InterNACHI's published Standards of Practice cover the roof, the exterior, the basement, foundation, crawl space and structure, heating, cooling, plumbing, electrical, the fireplace, the attic with its insulation and ventilation, and doors, windows and interior as distinct areas to examine.
Working through your own home in that same order, one system at a time, gives you a checklist instead of a memory test. ASHI's independently published Standard of Practice, which calls itself a minimum standard for home inspections, addresses substantially the same systems and states the same limitations.
What a visual walkthrough can't catch
Standards-of-practice inspections, whether done by you or a professional, are non-invasive and visual. InterNACHI's Standards of Practice state plainly that an inspection is not technically exhaustive and will not identify concealed or latent defects, and that its findings are based on observations made on the date of the inspection rather than a prediction of future conditions. ASHI's standard says much the same, adding that inspectors are not required to report concealed conditions, latent defects, or consequential damages.
That is a real limit, not a reason to skip the walk. A structured visual pass is the same starting point a licensed inspector would use, and it is what turns a vague complaint into a specific, locatable item on a list.
Document with dates and photos
As you go, write down what you find rather than relying on memory. Photograph anything questionable with a visible date, and note the room or system it belongs to, since this is the material you will turn into your written notice.
Submitting a List That Actually Holds Up
Put it in writing, not just a phone call
A phone call to your builder is not the same as notice under either of the two systems above that spell out a notice requirement. Under Form HUD-92544, the conformity warranty protects only the specific items for which the purchaser gave the warrantor written notice within the one-year window, so a verbal report does not satisfy it.
Send your list in a form you can prove was received: email with a read receipt, a portal submission you can screenshot, or physical mail you can track. Keep a copy for yourself.
State notice steps (California)
California goes a step further. Before a homeowner can file a Right to Repair Act construction-defect action, state law requires a written prelitigation notice, sent by certified mail, overnight mail, or personal delivery, describing the alleged violation in reasonable detail. Simply going through the builder's own customer-service process first does not substitute for this notice.
The throughline across every layer here, federal form, private warranty, and state statute alike, is the same: written notice, not a verbal complaint, is what protects your claim.
Before you decide something on your list doesn't qualify, check which cracks and gaps a warranty's performance tolerance actually treats as a defect, since a builder citing "within tolerance" is naming a specific document, not making a final call. And know in advance which company actually processes the claim you're about to file, since it may not be the builder itself.
What the warrantor owes you
Form HUD-92544 carries a second, separate warranty against defects in equipment, material, or workmanship supplied or performed by the warrantor or any subcontractor or supplier, running one year from the date of original title conveyance (or from full completion of items finished after conveyance). Under it, the warrantor must remedy, at the warrantor's own expense, any such defect the warrantor furnished, and must restore any work damaged in fulfilling that obligation.
That is the federal floor for FHA/VA-financed homes. Your private warranty booklet or your state's statute may set additional or different remedies, which is another reason to read your own closing documents rather than assume a generic structure applies.
None of this replaces a licensed inspector or an attorney. If your state's notice requirements or your warranty document leave you unsure how to proceed, or you are weighing legal action, that is a conversation for a professional who can read your specific paperwork.
If you are still working through the earlier steps of a new-construction purchase, the new-construction buyer's guide and the blue-tape walkthrough you already did before closing cover the stages before this one. The defects inspectors find most often in new homes is a useful checklist while you walk your own, and a local buyer's agent can help you find someone experienced with new-construction warranty claims.
Frequently asked questions
- What exactly is the 11-month warranty walk?
- It is a homeowner-led walk-through of a new home roughly a month before its first anniversary, done to compile a written list of defects while there is still time to submit it before year-one coverage narrows. This specific framing is editorial: no cited industry source uses the exact phrase.
- Do I have to submit my warranty list in writing?
- For FHA- or VA-financed homes, yes as a practical matter. Form HUD-92544's conformity warranty only protects items the purchaser gave the warrantor written notice of within the one-year window; a phone call does not satisfy that requirement.
- When does my one-year warranty clock actually start?
- Under Form HUD-92544, it is the date of original title conveyance or the date of initial occupancy, whichever happens first, not the date you signed your purchase contract.
- Does every builder warranty follow the same 1-2-10 structure?
- Not necessarily. 2-10 Home Buyers Warranty publishes a 1-year workmanship, 2-year systems, 10-year structural split as its own common structure, but Residential Warranty Company's own guidance says the specific plan booklet issued at your closing controls your actual terms. Confirm your own document rather than assuming a marketed structure applies.
- Is there a government-mandated new-home warranty everywhere in the U.S.?
- No single federal law creates one for every buyer. HUD's Form HUD-92544 deadline applies specifically to FHA- and VA-insured purchases. Some states add their own statutory standards, such as California's Right to Repair Act, but this varies by state and is not universal.
- Should I hire a professional inspector for the walk, or do it myself?
- It is not required. A paid inspection does follow the systematic scope defined in InterNACHI's and ASHI's Standards of Practice, which cover structure, roof, exterior, plumbing, electrical, heating and cooling, interior, and insulation and ventilation as distinct areas. Either way, both standards describe the work as visual and not technically exhaustive, so it is not a guarantee that nothing was missed.
Sources
- Form HUD-92544, "Warranty of Completion of Construction", U.S. Department of Housing and Urban Development (HUD) Official source
- FHA Single Family Housing Policy Handbook 4000.1, Section II.A.8.i, "Programs and Products - New Construction", U.S. Department of Housing and Urban Development (HUD) Official source
- California Civil Code Section 896 (Right to Repair Act), California Legislative Information Official source
- California Civil Code Section 941, California Legislative Information Official source
- California Civil Code Section 910, California Legislative Information Official source
- InterNACHI Standards of Practice for Performing a General Home Inspection, International Association of Certified Home Inspectors (InterNACHI) Official source
- ASHI Standard of Practice, American Society of Home Inspectors (ASHI) Official source