If your builder goes bankrupt before you close, your deposit and your half-built house are two separate legal fights, governed by different rules and different deadlines.

A home buyer standing among the bare timber studs of a stalled half-built house holding up a large hourglass drawn as a flat illustrated money-green hourglass

If your builder files for bankruptcy before your closing, you are dealing with two separate legal questions, not one. Your deposit is governed by federal bankruptcy law no matter what state you're in. Your half-built house is governed by whether you've already closed on the lot, and by your state's property and lien law. The two tracks have different rules, different timelines, and different tools you can use to protect yourself.

This is a different problem from a builder who is simply behind schedule, and it calls for different moves than canceling a new-construction contract on your own terms. Before any of it, it helps to know how an earnest money deposit generally works. It's also a separate risk from a cost-escalation clause letting the builder raise your price mid-build: one is about the builder charging you more, the other is about the builder not being there to finish at any price.

The purchase contract you signed does not automatically survive or automatically die. A bankruptcy trustee (in a Chapter 7 case) or the builder itself acting as "debtor in possession" (in a Chapter 11 case) gets to decide whether to assume or reject it under 11 U.S.C. § 365. Rejecting the contract counts as a breach, which you then pursue as a claim inside the bankruptcy case rather than as an outside lawsuit.

Your Deposit vs. Your House

These are genuinely different problems with different remedies.

  • Your deposit is cash the builder already holds or controls. It becomes part of the bankruptcy estate, and what you get back (if anything) depends on the bankruptcy chapter, the priority rules, and how much money is actually left.
  • Your house is a physical asset with its own ownership and lien questions that mostly turn on state law, not federal bankruptcy law, and on whether you'd already closed on the lot before the builder stopped work.

Which chapter the builder files under changes almost everything downstream, so that's the first thing to check.

Chapter 7 vs. Chapter 11

Chapter 7: Liquidation

In a Chapter 7 case, a court-appointed trustee takes over and liquidates the company's nonexempt assets "in a manner that maximizes the return to the debtor's unsecured creditors." If every asset turns out to be exempt or already subject to valid liens, the trustee files a "no asset" report and there is no distribution to unsecured creditors at all.

The federal courts note that most Chapter 7 cases involving individual debtors are no-asset cases; whether a corporate builder's case has anything to distribute is something you will not know at the outset. Either way, a builder in Chapter 7 is being liquidated, not kept in business to finish houses.

Chapter 11: Reorganization

In a Chapter 11 case, the company usually stays in charge of its own assets as a "debtor in possession," without a trustee taking over. It typically proposes a court-approved plan of reorganization to keep the business alive and pay creditors over time. This is why a builder in Chapter 11 may still be operating, and may still finish homes under the plan, in a way a Chapter 7 builder generally will not.

What Happens to Your Deposit

Your Contract, the Trustee's Call

Section 365 applies to "executory contracts," and the Bankruptcy Code's definitions section does not define that term. Whether your specific unclosed purchase contract lands inside it is a question for the bankruptcy court and your own attorney, not something you can read off the statute. What the statute does confirm nationwide is the mechanism: subject to the court's approval, the trustee or debtor in possession can choose to assume the contract (keep it alive) or reject it (treat it as breached), and that decision is not yours to make.

Why You Can't Just Sue

The moment a bankruptcy petition is filed, the automatic stay under 11 U.S.C. § 362 halts the start or continuation of most lawsuits and collection actions against the builder. In practice, that means you generally cannot simply file suit for your deposit back the day the case opens; your claim has to go through the bankruptcy case itself.

That happens through a formal step, not an informal request.

  • File a proof of claim. An unsecured creditor must file a proof of claim with the bankruptcy court to receive any distribution, and only in cases where the estate actually has assets to distribute.
  • Wait for the estate to be sorted. Whether there's anything to distribute at all depends on what's left after secured creditors and higher-priority claims are paid.

The $3,800 Priority Cutoff

Federal law gives your deposit special, but limited, protection. Under 11 U.S.C. § 507(a)(7), an individual's pre-petition deposit toward the purchase of property for personal, family, or household use gets 7th-priority status, ahead of ordinary unsecured creditors, up to $3,800 per person. That cap took effect April 1, 2025, up from $3,350.

Anything above that cap drops down to a general unsecured claim, which is paid only after secured debts and every higher-priority claim, and which can pay a few cents on the dollar or nothing at all depending on what's left in the estate.

That $3,800 cap is exactly why it matters who holds your money and when each installment becomes non-refundable in the first place. See the calendar of buyer payments and who is supposed to hold them before you agree to pay in more than the federal priority cap would ever get back.

What Happens to the House

The house question splits on one fact: have you already closed on the lot?

Before You Close: Builder's Asset

If you haven't closed yet, the unfinished house sits on land the builder still owns. Legally, it's the builder's asset, which is why your recourse runs through the bankruptcy case (as a contract claim, per the section above) rather than through a direct claim on the physical structure. See where a stalled build sits in the normal contract-to-closing sequence for how that timeline is supposed to run.

After You Own the Lot: Lien Risk

If you already own the lot and hired a general contractor directly, the house is not part of the builder's bankruptcy estate at all. It's already yours. That ownership comes with a risk the automatic stay does nothing to prevent.

California's licensing board states the mechanism in plain consumer terms: contractors, subcontractors, laborers, and material suppliers can file a mechanics lien on a homeowner's property if they don't get paid. The automatic stay protects the bankrupt builder's own property from new liens; it does not protect property you already own.

California also spells out the consequence directly. Its board says the homeowner is ultimately responsible for payment even if they have already paid the direct contractor, and lists "double payment for the same job" among the results of a recorded lien. Lien statutes are state law and the specifics differ, so confirm how your own state handles it. Where unpaid subs can lien, though, the trap has the same shape: you pay once at the contract level and again to clear a lien the contractor never should have let happen.

This works differently than buying a resale house that already has a lien against it, where the lien is a known, negotiated part of the deal rather than a surprise from an unpaid sub.

Lien Waivers Prevent Double-Paying

The defensive tool for this trap is the lien waiver, collected at every draw, not just at the end of the job.

Texas law is a useful illustration of why the paperwork matters and can't be taken on trust. Under Texas Property Code § 53.281, a lien or payment-bond waiver is only enforceable if it substantially matches the state's prescribed statutory form, is signed by the claimant or their authorized agent, and, for a conditional release, is backed by evidence that the claimant was actually paid. A waiver that skips any of that isn't worth the paper it's printed on.

Lien law is state-by-state, so the exact form requirements above are Texas-specific, and California's rule that an owner can be on the hook after already paying the direct contractor is California's. Neither one tells you what your own state does. Confirm your own state's lien and waiver requirements with its licensing board or a local construction attorney before relying on a signed release.

Recovery Funds and Surety Bonds

Beyond lien waivers, some states back licensed contractors with a recovery fund or a mandatory bond. This is not universal, and it depends entirely on whether your state licenses general contractors and home builders at all, which is one of the checks worth running before you sign with a builder, not after.

Nevada: A Recovery Fund

Nevada's Residential Recovery Fund lets a homeowner of a single-family residence recover actual damages caused by a licensed residential contractor, and the maximum paid on a claim cannot exceed $40,000.

A claim can go through either a Board finding of actual damages, which needs no court judgment, or a court judgment, with judgment-based claims filed within two years of the date the judgment was granted. Either path requires the homeowner to have exhausted all other means of recovery first, and the Board deducts anything already recovered elsewhere, so the fund does not guarantee recovery of a whole loss. Work by an unlicensed contractor isn't covered, and neither are homes that aren't single-family residences.

Washington: A Required Bond

Washington requires general contractors to carry a continuous surety bond of $30,000 (specialty contractors, $15,000). L&I frames bonding and insurance as a state-law requirement meant to protect the public. The state's contractor-licensing page confirms the bond requirement and the dollar amounts; it does not spell out the claims process or filing deadline, so treat the bond's existence as confirmed and check with Washington's Department of Labor & Industries directly for how to file against it.

Texas: No License to Attach One To

The Texas Department of Licensing and Regulation regulates dozens of trades, electricians and air conditioning contractors among them, but its list of regulated industries carries no general-contractor or home-builder category. With no such license on the books at that agency, the licensing-board recovery fund and the mandatory bond that stand behind a Nevada or Washington contractor have no Texas counterpart to attach to. Check the current list yourself rather than assuming a backstop is there.

StateConsumer backstopCapRequires
NevadaResidential Recovery Fund$40,000 maximum per claimLicensed contractor, single-family residence, other remedies exhausted
WashingtonContinuous surety bond$30,000 general / $15,000 specialtyContractor registration
TexasNo licensing-board fund or bondN/ATDLR lists no builder or general-contractor license

Check your own state's contractor-licensing board directly. None of these three programs should be assumed to exist, or to work the same way, anywhere else. For a closer look at what recovery funds in other states cap, require, and exclude beyond Nevada, see the six-state breakdown of contractor recovery fund rules.

Where Complaints Actually Go

A state attorney general's office is a real channel, but it's not a substitute for your own legal counsel on an individual dispute. North Carolina's Department of Justice says it responds to about 20,000 consumer complaints a year and can act on a pattern of illegal business practices, but states plainly that it "can't represent you in a private legal case."

Washington's Attorney General frames contractor disputes the same way, pointing consumers to the state's contractor-licensing agency rather than resolving individual cases directly. Two different states, the same posture: acting on broader misconduct, not standing in for your own lawyer on one claim. You can find your own state's office through USA.gov's attorney general directory.

The Bottom Line

A builder bankruptcy splits into two separate fights: getting whatever share of your deposit federal priority rules allow, and protecting a house you may already own from liens the automatic stay can't touch. Chapter 7 usually means the company is winding down; Chapter 11 means it may keep building under a court-approved plan.

Either way, up to $3,800 of your deposit gets priority status and the rest lines up with everyone else. Collect lien waivers at every draw, and check whether your state runs a recovery fund or requires a bond.

This moves through a court process on its own schedule. The sooner you're inside that process with a filed claim and an attorney of your own, the better your odds of recovering anything. For the full sequence of protections around a new-construction purchase, see the guide to contracts, escrow, and closing and the new-construction home buyer's guide.

A different problem shows up after closing, once the home is built and something goes wrong with it: the builder's project-specific LLC has simply dissolved rather than filed for bankruptcy. See how to check whether that entity is still suable, and who else might still be on the hook for that separate situation.

Frequently asked questions

Do I get my earnest money deposit back if my builder goes bankrupt?
Not automatically and not necessarily in full. Your deposit becomes a claim inside the bankruptcy case rather than a simple refund request. Up to $3,800 per person gets 7th-priority status ahead of general unsecured creditors; any amount above that is a general unsecured claim that can pay little or nothing depending on what's left in the estate.
Can I just sue my builder to get my deposit back?
Not right away. Filing bankruptcy triggers an automatic stay that halts most lawsuits and collection actions against the builder the moment the case is filed. You pursue the claim inside the bankruptcy case by filing a proof of claim, rather than as an outside lawsuit, unless a court specifically grants relief from the stay.
Will my house still get built?
It depends on the chapter and on what the trustee or debtor in possession decides to do with the purchase contract. A Chapter 11 filing lets the company keep operating and propose a plan that could include finishing homes. A Chapter 7 filing generally means the company is winding down, and rejecting the contract is a breach, not a promise the house gets finished.
I already own the lot and paid my contractor in full. Can a subcontractor still put a lien on my house?
Generally yes, if your state's mechanic's-lien law allows it and the subcontractor wasn't paid by the general contractor. The bankruptcy automatic stay protects the builder's own property from new liens, not property you already own outright, which is exactly why collecting a lien waiver at every draw matters.
Does my state have a recovery fund or bond I can file a claim against?
Maybe, but it's not universal and varies by state. Nevada's Residential Recovery Fund pays no more than $40,000 per claim and offers a Board-finding path that doesn't require a court judgment first. Washington instead requires contractors to carry a $30,000 (general) or $15,000 (specialty) continuous surety bond. Texas's licensing department lists no general-contractor or home-builder license, so there's no licensing-board fund or bond attached to a Texas builder. Check your own state's contractor-licensing board directly.
Should I contact my state attorney general?
It can be worth doing, but set expectations. AG offices are a channel for spotting and acting on patterns of misconduct, not a substitute for your own legal counsel on an individual case. Multiple state AG offices state directly that they do not represent individuals in private legal disputes.

Sources

  1. Chapter 7 - Bankruptcy Basics (Liquidation Under the Bankruptcy Code), Administrative Office of the U.S. Courts (uscourts.gov) Official source
  2. Chapter 11 - Bankruptcy Basics (Reorganization Under the Bankruptcy Code), Administrative Office of the U.S. Courts (uscourts.gov) Official source
  3. 11 U.S.C. Section 365 - Executory contracts and unexpired leases, Cornell Law School, Legal Information Institute (U.S. Code) Official source
  4. 11 U.S.C. Section 101 - Definitions, Cornell Law School, Legal Information Institute (U.S. Code) Official source
  5. 11 U.S.C. Section 362 - Automatic stay, Cornell Law School, Legal Information Institute (U.S. Code) Official source
  6. 11 U.S.C. Section 507(a)(7) - Priorities (consumer deposit claims), Cornell Law School, Legal Information Institute (U.S. Code) Official source
  7. The Process - Bankruptcy Basics, Administrative Office of the U.S. Courts (uscourts.gov) Official source
  8. Understanding Mechanics Liens, California Contractors State License Board (CSLB) Official source
  9. What is a Mechanics Lien?, California Contractors State License Board (CSLB) Official source
  10. Texas Property Code Section 53.281 - Waiver and Release of Lien or Payment Bond Claim, Texas Property Code, via texas.public.law statute mirror Official source
  11. Residential Recovery Fund, Nevada State Contractors Board Official source
  12. Contractors licensing (Contractor bonding requirement), Washington State Department of Labor & Industries (L&I) Official source
  13. TDLR homepage / regulated industries list, Texas Department of Licensing and Regulation (TDLR) Official source
  14. Protecting Consumers, North Carolina Department of Justice (Attorney General) Official source
  15. Contractors, Washington State Office of the Attorney General Official source
  16. Find your attorney general, USA.gov (U.S. General Services Administration) Official source

About the author

Lexy Glassman is a Nevada Broker-Salesperson (license BS.0144219, licensed since 2013) and VP of Development and Compliance at Platinum Real Estate Professionals, where she built the brokerage's state-compliance systems and mentors and trains agents daily. She is an elected member of the Las Vegas REALTORS® Board of Directors (2025–2026), a two-time GLVAR Young Professionals Network "40 Under 40" honoree, and a YPN Hall of Fame member. She leads The Glassman Group — rated 5.0 across 83 team reviews on Zillow, with 222 team sales — serving Las Vegas, Henderson, and Utah, and works with buyers, sellers, relocations, and military families. A second-generation REALTOR® who grew up in the business and a UNLV marketing graduate who serves on the Lee Business School Corporate Advisory Board, she writes about pricing, negotiations, and the closing process because enforcing how closings are done right is her day job.

Home Stimulus is a new-construction marketplace and homeowner toolkit; articles may reference its 1% listing service performed by licensed partner agents, its cash-offer option, and agent matching.

Ready to make your move?

Put the guidance to work: get a no-obligation cash offer on the home you're leaving, or list it for 1%.

The Home Stimulus app

Your next home, in your pocket.

Search every new-construction home we track, watch builder incentives move, and get an alert the moment a price drops.