FHA, VA, and USDA Loans on New Construction: The Extra Rules

FHA, VA, and USDA loans all finance a newly built home, but each program adds its own builder certification, inspection, and warranty paperwork, most of which is the builder's job to produce, not yours.

A loan inspector standing beside a pickup truck at the curb of newly built homes holding a clipboard drawn as a flat illustrated money-green clipboard with a house and a check mark on it

FHA, VA, and USDA loans all finance a newly built home. The eligibility question is not in doubt: what changes on new construction is the documentation trail. Each program layers its own builder certification, inspection path, and warranty requirement on top of the usual purchase file, and most of that paperwork belongs to the builder, not the buyer.

That distinction matters most for buyers already narrowing in on how much house they can actually afford and stuck between a builder's in-house lender and an outside government-backed loan. The extra steps below are real, but they are steps a builder or loan officer can walk through, not reasons to give up a lower-cost loan.

Defining New Construction by Program

Before the paperwork, each program defines "new" a little differently.

  • FHA treats a home as New Construction if it is Proposed Construction, Under Construction, or Existing Less Than One Year, and that last category requires that the home was never occupied. FHA treats the sale of an occupied property completed less than a year after its Certificate of Occupancy as an existing property.
  • USDA requires new dwellings to be designed and built to certified plans and specifications meeting current International Code Council (ICC) standards, or the state-adopted version of that code.
  • VA requires any property securing a VA-guaranteed loan, including a proposed or newly built home, to meet the planning and construction standards the VA Secretary sets under federal law.

Buyers weighing a builder's spec home against an existing resale should also see how new construction compares to buying resale before locking in a loan program.

FHA Rules for New Construction

FHA's requirements live in HUD Handbook 4000.1, the agency's single-family policy manual, and most of them fall on the lender and builder rather than the buyer directly.

The Two Forms Every Builder Signs

For maximum financing, the mortgagee must obtain and include these builder-signed documents in the case binder, along with proof the project started properly:

  • HUD-92541 (Builder's Certification of Plans, Specifications, and Site): the builder's certification covering the home's plans, specifications, and site.
  • HUD-92544 (Warranty of Completion of Construction): the builder's warranty on the finished home.
  • Evidence of Pre-Approval: an Early Start Letter, or a copy of the building permit issued by the local authority before construction started.

The same case binder list also calls for the required inspections, a wood infestation report unless the property sits in an area on HUD's termite treatment exception list, and local health authority well water or septic reports where the jurisdiction requires them.

The appraiser must also be handed a fully executed HUD-92541, signed and dated no more than 30 days before the appraisal was ordered. Exhibits scale with how complete the home is: a floor plan and plot plan for a property 90 percent complete or less, and a list of components still to be installed or completed for a property above 90 percent but not yet finished.

Inspections, or a Permit Plus a CO

For site-built homes and condominiums, what the mortgagee must obtain depends on how far along the home was at the time of the appraisal:

  • Proposed Construction: copies of the building permit and the Certificate of Occupancy (or equivalent), or three inspections (footing, framing, and final) performed by an ICC Residential Combination Inspector or Combination Inspector, or by the local authority with jurisdiction over the property.
  • Under Construction: copies of the building permit and the CO (or equivalent), or a final inspection issued by the local authority or an ICC inspector.
  • Existing Less Than One Year: a copy of the CO (or equivalent), or a final inspection issued by the local authority or an ICC inspector.

Current Handbook 4000.1 does not list a 10-year insured warranty plan as a substitute for any of those paths. The compliance or final inspection for new construction is reported on form HUD-92051, Compliance Inspection Report.

The 90% LTV Cap Without Paperwork

A property that is Under Construction or Existing Less Than One Year is capped at 90 percent loan-to-value unless the Pre-Approval evidence and required documentation are in the file. The loan does not fail outright, but the buyer's financing shrinks.

VA Rules: The Builder ID Is Gone

VA's biggest recent change is easy to miss because it is so recent. VA Circular 26-25-1, dated March 31, 2025 and effective immediately, rescinded the builder identification number requirement for VA-guaranteed loans on new and proposed construction properties.

What Changed on March 31, 2025

  • Before: VA Pamphlet 26-7, the Lenders Handbook, directed builders to obtain a VA-issued identification number for each state where they build homes for veterans using VA-guaranteed loans, assigned before the Notice of Value was issued.
  • Now: a VA-issued builder identification number is no longer necessary to issue the Notice of Value or to process a loan on a new or proposed construction property. References to it in Lenders Handbook Chapters 7, 10, and 13 will be removed in a future revision.
  • Still true: builders are still expected to meet any state or local licensing requirements.

The Warranty VA Still Requires

Each Certificate of Reasonable Value issued on a proposed or newly constructed dwelling must carry the express condition that the builder, seller, or real party in interest deliver the veteran a warranty that the property was completed in substantial conformity with the plans and specifications the valuation was based on. No certificate of guaranty or insurance credit issues unless a copy of that warranty, receipted by the purchaser, is submitted with the loan papers. One-family units in condominium developments fall under a separate set of VA regulations.

The form is the same one FHA uses: VA Form 26-1859, also issued as HUD-92544. Notice of substantial nonconformity has to reach the warrantor within one year of the original conveyance of title or of initial occupancy, whichever comes first. The form's separate warranty against defects in equipment, material, or workmanship runs one year from the original conveyance of title.

VA has relied on this local-inspection-plus-warranty model since February 2006, when it stopped performing its own construction compliance inspections. In its place, VA leans on local building inspections and a builder warranty of 1 or 10 years. For the full history of the rescinded builder ID requirement and how the VA Form 26-1859 warranty actually works, see VA builder requirements and the one-year warranty rule.

Who Still Needs a Builder ID

The builder ID requirement did not disappear everywhere:

  • Specially Adapted Housing (SAH) grants still require it.
  • Native American Direct Loans (NADL) still require it.
  • Other VA-guaranteed loans on new or proposed construction do not.

VA also changed how it handles builder complaints. It now points veterans to local building departments, licensing boards, or legal counsel rather than intervening directly, except for complaints filed during the 1-year warranty period on loans with a Notice of Value issued before the circular.

USDA Rules: Plans, Inspections, Thermal

USDA's guaranteed program, detailed in HB-1-3555 Chapter 12, builds its new-construction file in three parts: certified plans, construction inspections paired with a builder warranty, and evidence the home meets the energy code.

Certifying the Plans

The lender's file must show the plans and specifications comply with the applicable development standards, which the chapter defines as the current ICC standards or the current state-adopted ICC code. Acceptable evidence is one of three things:

  • A certification from a qualified individual or organization: a licensed architect, a professional engineer, a plan reviewer certified by a national model code organization, a local building official authorized to approve plans, or a national codes organization. Form RD 1924-25 is an acceptable format but is not a required form for the guaranteed program.
  • A Certificate of Occupancy issued by a local jurisdiction.
  • A building permit (or equivalent) issued by a local jurisdiction.

Three Inspection and Warranty Paths

Evidence of construction inspections must satisfy one of three combinations:

  • Path 1: a Certificate of Occupancy from a jurisdiction that performs at least three construction phase inspections, plus a 1-year builder warranty plan acceptable to Rural Development.
  • Path 2: three inspections, at footings and foundation before pouring and back-filling, at shell completion while plumbing, electrical, and mechanical work is still exposed, and a final inspection before occupancy, plus that same 1-year builder warranty plan. Builders can use their own warranty form, HUD-92544, or Form RD 1924-19, and applicants who build their own homes cannot provide a self-warranty.
  • Path 3: a final inspection plus a 10-year insured builder warranty.

The Energy Code Requirement

The lender's file must also contain evidence the home's thermal standards meet or exceed the International Energy Conservation Code (IECC) in effect at the time of construction. A final inspection or a Certificate of Occupancy issued by a local jurisdiction meets that requirement on its own. Otherwise the builder, or a qualified registered architect or engineer, certifies conformance with IECC standards.

FHA reaches the IECC from a different direction. Handbook 4000.1 uses form HUD-92541 to evidence the energy code a new home was built to, but only when the borrower is being qualified under FHA's Energy Efficient Homes stretch ratios, not as a blanket requirement on every new build.

Missing Paperwork, Lower LTV

A new-home purchase that cannot meet the minimum plan-certification, inspection, and warranty documentation is capped at 90 percent loan-to-value, the same ceiling FHA applies. The lender may still loan the one-time upfront guarantee fee on top of that cap.

USDA does not require the lender to routinely submit these documents to the Agency. Plans, certifications, permits, inspection copies, occupancy certificates, and warranty copies stay in the lender's file and surface only on request, such as a processing review of a newly approved lender, a periodic compliance review, or a loss claim.

FHA vs. VA vs. USDA vs. Conventional

The table below lines up what each government program asks for against Fannie Mae's conventional approach. Cells marked "not addressed" reflect a real gap in the sourced material, not an omission.

ProgramBuilder documentationInspection path(s)WarrantyBuilder ID/registrationIf paperwork is missing
FHAHUD-92541 plus HUD-92544, plus Pre-Approval evidencePermit and CO, or 3 inspections (footing, framing, final) on Proposed Construction; a final inspection once under construction or complete1-year builder warranty (HUD-92544)No builder ID in FHA's New Construction documentation list90% LTV cap
VAWarranty condition on the Certificate of Reasonable ValueLocal building inspections (VA stopped its own compliance inspections in 2006)Builder warranty of 1 or 10 years (VA Form 26-1859)Not required since March 31, 2025; still required for SAH grants and NADLNo guaranty or insurance credit until the receipted warranty is submitted
USDAPlan certification (architect, PE, plan reviewer, official, or code org) plus IECC thermal evidence3 paths combining a CO, phase inspections, or a final inspection1-year builder warranty, or a 10-year insured warranty on the final-inspection pathNot addressed in the sourced USDA chapter90% LTV cap
Conventional (Fannie Mae)Form 1004D completion report, or a borrower/builder attestation letter with photosCompletion verified by the appraiser or by attestation, with no permit/CO or phase-inspection requirement in this topicNot addressed in this Selling Guide topicNot addressed in this Selling Guide topicNot addressed in this Selling Guide topic

When a Builder Pushes Back on Your Loan

A builder's sales team is not wrong when it says government loans add steps. They do. But almost every one of those steps is paperwork the builder produces, not something that weakens the buyer's file.

A buyer can ask for these documents by name instead of switching lenders:

  • FHA: HUD-92541 and HUD-92544.
  • VA: the builder's warranty (VA Form 26-1859 / HUD-92544); no VA builder ID number is needed on a new or proposed construction property.
  • USDA: the plan certification and the IECC thermal evidence.

Buyers financing the construction itself, rather than buying an already-planned spec or production home, face a different set of rules. See FHA's one-time-close construction loan option and how a construction-to-permanent loan closes for that layer.

For buyers still assembling the rest of the deal, federal grant and loan programs that help fund building a home and stacking down payment assistance with a builder's closing-cost incentive are worth reading next. Buyers touring model homes without their own representation should also consider whether they need their own agent at a builder's sales office.

If PCS orders or deployment could disrupt your build before you close, what the Servicemembers Civil Relief Act actually protects, and doesn't, on a signed new-construction contract is worth reading alongside whichever of these programs you're using.

Before signing anything, it helps to estimate what you can actually afford, and to browse current new-construction communities and quick move-in homes to compare a builder's offer against the loan program that fits.

Frequently asked questions

Does FHA still let a 10-year warranty substitute for inspections on a new home?
No. Current HUD Handbook 4000.1 does not list a 10-year insured warranty plan as an alternative documentation path. For Proposed Construction the mortgagee obtains either the building permit and the Certificate of Occupancy, or three inspections (footing, framing, and final) by an ICC Residential Combination Inspector or Combination Inspector or by the local building jurisdiction. A home already under construction, or completed less than a year ago, needs the permit and CO or a final inspection instead.
Do I need a VA builder ID number to buy new construction?
Not since March 31, 2025, when VA Circular 26-25-1 rescinded it. A VA-issued builder identification number is no longer necessary to issue the Notice of Value or to process a loan on a new or proposed construction property for VA-guaranteed loans. It is still required for a Specially Adapted Housing grant or a Native American Direct Loan, and builders are still expected to meet any state or local licensing requirements.
What warranty is a builder required to give on an FHA or VA loan?
Both programs use the same joint document, VA Form 26-1859 / HUD-92544, Warranty of Completion of Construction. The builder warrants substantial conformity with the plans and specifications, with notice of any nonconformity due within one year of the original conveyance of title or of initial occupancy, whichever happens first. The form separately warrants against defects in equipment, material, or workmanship for one year from the original conveyance of title.
Does USDA require an energy-efficiency certification on a new build?
Yes. The lender's file must show the home's thermal standards meet or exceed the International Energy Conservation Code in effect at the time of construction. A final inspection or a Certificate of Occupancy issued by a local jurisdiction meets that requirement on its own. Otherwise the builder, or a qualified registered architect or engineer, certifies conformance with IECC standards.
What happens if a builder can't produce the required paperwork before closing?
The loan does not automatically fail, but financing is capped. An FHA property that is Under Construction or Existing Less Than One Year without the Pre-Approval evidence and required documentation is limited to 90 percent loan-to-value; USDA applies the same 90 percent cap when its plan-certification, inspection, and warranty documentation is missing.

Sources

  1. FHA Single Family Housing Policy Handbook 4000.1, II.A.8 New Construction and II.D.3 Acceptable Appraisal Reporting Forms and Protocols, U.S. Department of Housing and Urban Development (HUD/FHA) Official source
  2. 38 CFR 36.4351, Minimum property and construction requirements (VA-guaranteed loans), U.S. Department of Veterans Affairs / Code of Federal Regulations (Cornell Legal Information Institute) Official source
  3. 38 CFR 36.4367, Requirement of construction warranty (VA-guaranteed loans), U.S. Department of Veterans Affairs / Code of Federal Regulations (Cornell Legal Information Institute) Official source
  4. VA Circular 26-25-1, Elimination of Builder Identification Number for Certain Guaranteed Loans and Updates to Builder Complaint Process, U.S. Department of Veterans Affairs, Veterans Benefits Administration, Loan Guaranty Service Official source
  5. VA Form 26-1859 / HUD Form 92544, Warranty of Completion of Construction, U.S. Department of Veterans Affairs and U.S. Department of Housing and Urban Development Official source
  6. USDA HB-1-3555, Chapter 12: Property and Appraisal Requirements, Section 12.9(B) New Dwellings, U.S. Department of Agriculture, Rural Development Official source
  7. Fannie Mae Selling Guide, B4-1.2-05, Requirements for Verifying Completion and Postponed Improvements, Fannie Mae Official source

About the author

Jackie Chung is a Las Vegas REALTOR® with Platinum Real Estate Professionals (Nevada license S.0178920, licensed since 2016), a U.S. military veteran, and a former Wells Fargo banker — the path that shaped his focus on mortgages, affordability, and what market data actually means for buyers. He is a buyer's agent first: 54 of his last 72 closings were on the buyer side, at an average price near $465,000 — exactly the tier where rates, down-payment assistance, and monthly payments decide whether a deal happens. He holds a 5.0 rating across 16 Zillow reviews, works extensively with first-time, VA-loan, and relocation buyers, and serves clients in English and Cantonese.

Home Stimulus is a new-construction marketplace and homeowner toolkit; articles may reference its 1% listing service performed by licensed partner agents, its cash-offer option, and agent matching.

Ready to make your move?

Put the guidance to work: get a no-obligation cash offer on the home you're leaving, or list it for 1%.

The Home Stimulus app

Your next home, in your pocket.

Search every new-construction home we track, watch builder incentives move, and get an alert the moment a price drops.